Advanced Planning and Scheduling (APS)

In brief: Advanced planning and scheduling (APS) is a planning method – and the software that implements it – that creates feasible production plans and detailed schedules by taking finite capacities and other constraints into account at the same time: machines, tools, personnel, material availability and due dates. Unlike classic MRP, which assumes unlimited capacity, APS calculates sequences and start and end times that the plant can actually meet.

How APS works

An APS system combines three kinds of input: demand (customer and production orders with due dates), master data (routings, work centers, setup times, shift calendars) and the current status (stock, work in progress, machine availability). Optimization algorithms or rule-based heuristics then assign each operation to a resource and a time slot so that all constraints are respected and goals such as on-time delivery, short lead times or low setup effort are balanced.

When something changes – a rush order, a machine breakdown or a late delivery – the schedule is recalculated. What-if scenarios let planners compare alternatives before releasing one.

Typical APS functions

APS, MRP and MES: who does what?

All three are building blocks of production management.

Why APS matters

Many variants, small lot sizes, short delivery times and frequent disruptions make manual or spreadsheet-based planning slow and error-prone. APS makes the effects of a change visible before they reach the shop floor. In iTAC.MOM.Suite, detailed planning is provided by the DUALIS APS service, an integral part of the suite.